HFB1217 Send message Joined: 25 Dec 05 Posts: 102 Credit: 9,424,572 RAC: 0 |
How is it computed and where is it computed at Berkeley or in Boinc on your system. Why does it go wacky and give weired DCF numbers like 654.xxxx it had work units that had 2000 plus hours manually changed it back to .67xxx and it's running fine for now. Every once and a while my WU times go from about 2 hours to 7 ot 8 hours I reset it and all is well for who knows weeks or so. |
1mp0£173 Send message Joined: 3 Apr 99 Posts: 8423 Credit: 356,897 RAC: 0 |
How is it computed and where is it computed at Berkeley or in Boinc on your system. It is calculated on your system. In theory, the benchmark * the expected time factor from the project is a fair predictor of performance. In practice, the benchmark may be fairly inaccurate for a number of reasons. If you just leave it alone when it goes to 7 or 8 hours, you'll notice that BOINC will adjust it down and everything will return to normal by itself. |
OzzFan Send message Joined: 9 Apr 02 Posts: 15691 Credit: 84,761,841 RAC: 28 |
As ROM explained DCF and CPU Efficiency to me: CPU efficiency is the difference between how much CPU time a process received relative to the amount of wall clock time that has passed. It is the answer to the question of "In the last ten minutes or so, how much CPU did BOINC based science applications receive?" The thing to remember here is that the OS is constantly doing things in the background and each of those things eats a little bit of the CPU. |
John McLeod VII Send message Joined: 15 Jul 99 Posts: 24806 Credit: 790,712 RAC: 0 |
As ROM explained DCF and CPU Efficiency to me: Actually, ROM missed a little. A score less than 1 means that your computer finishes work faster than expected for its benchmarks. A score that is higher indicates that it finishes slower than expected for its benchmarks. It is calculated as a safety for the CPU scheduler (finish on time) and work fetch (not too much), therefore under estimates are corrected very quickly (single step) and over estimates are corrected much more cautiously. The algorithm: if (original corrected estimate < actual CPU time) DCF *= actual CPU time / original corrected estimate else if (original corrected estimate > 100 * actual CPU time) // this is probably the equivalent of an S@H noisy result - caution DCF = .99 * DCF + 0.01 * actual CPU time / original corrected estimate else // this may or may not be a short result of some sort. DCF = .9 * DCF + 0.1 * actual CPU time / original corrected estimate This is from memory, and is not an exact copy of the relevant code. BOINC WIKI |
Pepo Send message Joined: 5 Aug 99 Posts: 308 Credit: 418,019 RAC: 0 |
Why does it go wacky and give weired DCF numbers like 654.xxxx it had work units that had 2000 plus hours manually changed it back to .67xxx and it's running fine for now. It happened to me once, maybe half a year ago, I reported about it on Seti Beta pages. If you just leave it alone when it goes to 7 or 8 hours, you'll notice that BOINC will adjust it down and everything will return to normal by itself. :-( I was observing it few (2-3) days, DCF's were changing as defined (%-wise) and it would take weeks/months to stabilize :-) Thus I had to correct it manually too. [edit]Actually I reported it on Boinc pages, never mind. My DCFs also jumped to range of hundreds, it happened with Boinc 5.3.31 for Windows.[/edit] Peter |
John McLeod VII Send message Joined: 15 Jul 99 Posts: 24806 Credit: 790,712 RAC: 0 |
DCF values can be strange if you have a bad benchmark, as the DCF is counting on the benchmark numbers as part of the original estimate. BOINC WIKI |
Pepo Send message Joined: 5 Aug 99 Posts: 308 Credit: 418,019 RAC: 0 |
Sure. But in my case, the benchmark values seemed to be plausible, last benchmark was run approx. 2 days prior DCFs jumping high and the estimated run times were also fine previously. I was not able to find an explanation. Peter |
Richard Haselgrove Send message Joined: 4 Jul 99 Posts: 14681 Credit: 200,643,578 RAC: 874 |
Sure. But in my case, the benchmark values seemed to be plausible, last benchmark was run approx. 2 days prior DCFs jumping high and the estimated run times were also fine previously. I was not able to find an explanation. I know I got a bad DCF when I let a machine reboot while it was running benchmarks. Presumably that benchmark was extremely slow, and affected the DCF: and remember that DCF is on a sort of ratchet - increases immediately, but only decreases gradually. Even if you run a new benchmark, I don't think that will put things back to normal immediately. |
1mp0£173 Send message Joined: 3 Apr 99 Posts: 8423 Credit: 356,897 RAC: 0 |
DCF values can be strange if you have a bad benchmark, as the DCF is counting on the benchmark numbers as part of the original estimate. ... and if I understand it correctly, the DCF depends on reasonable estimates from the project. If the project suggests that their work takes twice as long as it actually does, you will get a DCF somewhere around 0.5. |
©2025 University of California
SETI@home and Astropulse are funded by grants from the National Science Foundation, NASA, and donations from SETI@home volunteers. AstroPulse is funded in part by the NSF through grant AST-0307956.