What is wrong? |
![]() |
| log in |
Message boards : Number crunching : What is wrong?
| Author | Message |
|---|---|
|
HI guys, my boinc its set to Minimum work buffer: 10 days, Max additional work buffer: 10 days, Use at most: 1 GB of disk space. All of the WUS have 5h to execute. It is normal ? | |
| ID: 1274666 · | |
|
Judging from your completion times for work you've done, I'd say the estimates for work on board are pretty close. | |
| ID: 1274672 · | |
|
And if i have 1 days cache, and an additional 0.01 days the WUS will decrease the completion time? I thought that rising the days cache i would have more WUS to crunch. | |
| ID: 1274679 · | |
|
Nope. | |
| ID: 1274718 · | |
|
Setting to 2+.01 gives me roughly 3-4 days of work for some reason, always has since 7.xxx | |
| ID: 1274721 · | |
|
So if you put 10+ 10 it will give 10 days plus another 10 ? | |
| ID: 1274724 · | |
|
I think using 10 +10 will give you a very lumpy ride. It will give you a 10 day stock, but only check that you need new work every 10 days. Far better to go for a something like 5 day cache and check every 0.1 days (or less) that way you will "always" have a nearly full cache. | |
| ID: 1274727 · | |
And why all WUS have 5h to complete? The short answer is they don't. maybe all the ones you have now do, but the next batch, with different Angle Ranges, could be different. It seems you only have work for your CPU; CPU's are much slower than GPU's. ____________ | |
| ID: 1274732 · | |
And why all WUS have 5h to complete? But having 5h to complete due the configuration 10 +10 too? | |
| ID: 1275115 · | |
And why all WUS have 5h to complete? Work unit completion time has nothing to do with cache settings, and vice versa. ____________ | |
| ID: 1275229 · | |
|
The time to complete is how long the task take to run once it starts. This is determined by the processing power of your computer (not a lot you can do about that) | |
| ID: 1275234 · | |
|
By the way it takes 5h to complete. This CPU (GenuineIntel | |
| ID: 1275244 · | |
|
Zapiao wrote: By the way it takes 5h to complete. This CPU (GenuineIntel No, I guess with stock project applications the time could be OK. You could install optimized project applications, CPU calculation time will be around the half. Also then you could let calculate work units on your AMD/ATI HD5xxx. * Best regards! :-) * Sutaru Tsureku, team seti.international founder. * Optimize your PC for higher RAC. * SETI@home needs your help. * ____________ >Das Deutsche Cafe. The German Cafe.< | |
| ID: 1275263 · | |
|
Where i can find them? | |
| ID: 1275265 · | |
Where i can find them? Optimised App release News is posted in the Bottom Stickie, which is the next thread above yours (at the moment): Optimized Applications and Other Binaries - Read Only Claggy | |
| ID: 1275271 · | |
Message boards : Number crunching : What is wrong?
| Copyright © 2013 University of California |