Questions and Answers :
Preferences :
Many work units assigned to the same computer pairs
Message board moderation
Author | Message |
---|---|
vhamann Send message Joined: 24 Nov 05 Posts: 1 Credit: 204,076 RAC: 0 |
Hi, I have come to realise that a lot of my work units have tasks assigned to identical computer pairs. Which means that whenever my "partner" computer (the one working on the same unit like mine) does not produce results for a long time, I have to wait for all my credits for a long time as well. This can be quite annoying. Is there an easy way to change this behaviour? Regards, Volker |
perryjay Send message Joined: 20 Aug 02 Posts: 3377 Credit: 20,676,751 RAC: 0 |
I'm afraid not Volker, it's the luck of the draw as to who you will be paired up with. You are just unlucky enough to be asking for work at the same time as the slow guy is. It will catch up as you go along just like savings in a bank. PROUD MEMBER OF Team Starfire World BOINC |
©2024 University of California
SETI@home and Astropulse are funded by grants from the National Science Foundation, NASA, and donations from SETI@home volunteers. AstroPulse is funded in part by the NSF through grant AST-0307956.