Outage Update: Last night (December 6) around 15:00 PST we powered down the entire project for lab-wide electrical repairs


log in

Advanced search

Message boards : News : Outage Update: Last night (December 6) around 15:00 PST we powered down the entire project for lab-wide electrical repairs

Author Message
SETI News
Volunteer moderator
Project administrator
Project developer
Project scientist
Send message
Joined: 16 Dec 09
Posts: 383
Credit: 0
RAC: 0
Message 956734 - Posted: 7 Dec 2007, 0:00:00 UTC

Outage Update: Last night (December 6) around 15:00 PST we powered
down the entire project for lab-wide electrical repairs. Without much ado we turned everything
back on this morning, and all data servers are slowly catching up.

Message boards : News : Outage Update: Last night (December 6) around 15:00 PST we powered down the entire project for lab-wide electrical repairs

Copyright © 2014 University of California